3/28/2023 0 Comments Crane lift chart![]() ![]() When we create lift plans, Maxim simulates positioning and lifting models using computer-drawn models before doing actual fieldwork. With these interpretations, we do not believe an OSHA Instruction STD is necessary. Maxim’s fleet includes crawler cranes that can lift to 2,535 tons, tower cranes exceeding 1,000 feet in height, and portable carry decks with excellent mobility. When information is contained in bookform, a way of complying with these provisions would be to provide a bookholder designed to keep the book open to the relevant page(s), and located so as to be visible to the operator while at the control station. However, this interpretation does not change the need to have the relevant instructions, warnings and load rating charts for a lift "visible to the operator" as required by. " are met when the required information is contained in a notebook securely attached to the interior of the crane cab, such as by the use of a lanyard. 550(a)(2), ".shall be conspicuously posted. ![]() Consequently, it is our interpretation that the posting requirements of. We agree with your statement that the crane industry is currently supplying information, including load charts, in a manner different than what was done and acceptable to OSHA in the past. The load chart should be available for the. ![]() This is in response to your August 14 memorandum in which you request clarification of the load chart posting and visibility requirements for mobile cranes. Load charts, also called rated capacity charts, identify what load a crane or other plant is able to lift safely. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |